Process & Implementation for Exterior Work |
|
|
|
SETUP |
|
- Remove dirt and grime by water blasting at low to medium pressure
- High pressure is applied to hard to reach and stubborn areas
- Rain gutters cleaned out
- Trench 4” to 6” around perimeter of building
|
|
|
|
SURFACE AND PREPARATION |
|
- Scrape & sand smooth all loose pealing paint & rough surfaces
- Glossy enamel surfaces shall be scuff sanded
- Caulking on all open seams
- Stucco repaired to match existing surface
|
|
|
|
PAINT |
|
- Bondo repairs if necessary
- Primer applied to all bare metal, new stucco, raw wood & repaired areas
- Application of quality paints applied for consistent professional finish
|
|
|
|
CLEANUP |
|
- All project tools, equipment, and debris are removed from the site
- Final inspection & walk through
|
|
|
| |
|
| |
|
|
|